Power-First Infrastructure
AI computing capacity requires enormous amounts of reliable electricity. E2B4 is designed around integrated onsite power generation and microgrid infrastructure rather than treating power as a secondary development requirement.
Why it matters to investors: a campus that plans its own generation is designed to depend less on utility interconnection timelines, which can give the developer more control over delivery schedules. This is a design objective, not a demonstrated cost or schedule result.